|
| |
|
20Ft Bayliner This boat came to us to have the
floor finished. It went to another shop to have the floor done but
the owner was unhappy with their work. We are rebuilding the
floor. During our work we noticed the transom outer sections were
rotten. So we removed the rotten wood and replaced it. Now
we can reinstall the floor and finish it with two layers of fibre glass
matting.
I |
                   |
|
Yamaha Wave Runner |
   |
|
Champion Bass Boat Instead
of buying a new boat, that his wife said he could, Bob decided he really
loved his Champion Bass Boat and decided to have it refinished. We
have ground out some minor cracking and surface flaws, filled and primed
and will be painted a bright white and yellow combination.
During painting, we have painted the entire deck, and
sides white and then painted the yellow on top, because the yellow is
low hiding. Then taped off the yellow and repainted the white,
followed by three coats of clearcoat. |
                               |
|
Jeep Pickup Customer
brought this vehicle in for a complete body and paint job. After
removing some paint and bondo, we encountered a few surprises. The
doors are being replaced with a nice pair of southern, rust free doors.
The box is in very poor shape and has been repaired at least once
already. Box panels are not available for this model so we had to
make our own. Our new panels are welded in place and covered with
a water proof filler to seal any welding pin holes etc. The box
sides are shaped with some filler, sanded, and are now in primer.
|
                                                      |
|
1990 Shop Truck |
            |
|
New Building
" Without Prejudice"
We started construction on our new building in October,
the building started to be erected on December 7th, and at this
point is stalled. Our contractor,
does not seem to appreciate our urgency to put the building together. After
many disagreements about timeliness, workmanship, and other problems,
the original contractor has walked off the job. It took
approximately four weeks to find another contractor that was willing to
takeover the project. We found a local contractor, Jim Hamilton
from Essex. That was willing to finish the job. This
contractor has done an excellent job in repairing some of the defects
from the previous contractor. He has done an excellent job in
getting our building closed in.
A very important lesson was learned,
chose your contractors wisely, follow up to make sure that they have the
experience that they claim. Call past clients; which we
failed to do.
|
                |
|
1982 Searay Vanguard |
           |
|
1991 - 370 Searay
This boat came in to have stringers replaced and some
other minor cosmetic work. The engines have been removed, and the
compartment stripped in order to remove the old stringers.
The old stringers, forward bulkhead, and side panels were found to have
deteriorated, due to water intrusion and were removed. The entire
bilge was ground so that we can rebuild it. The new stringer
system is made from an engineering wood product called Paralam.
As you see the forward bulkhead and side panels have been installed and
glassed in. The stringers are next. We now have the
stringers fibreglassed in, the white product that you see is bonding
putty. We use the bonding putty to attach the stringers to the
hull to take up any voids, etc. and to create a smooth transition, from
the stringers, bulkheads, plates, etc. to the hull. Doing this
minimizes the chances of air pockets and makes for a neater finish.
|
                                                                    |
|
1979
Robalo CC This boat fell from its lift
during a wind storm. It required the hull to be refinished when
the boat fell, it cracked to transom, which was then replaced with new
wood and glass. |
                         
|
|
Starcraft Bowrider |
            |
|
1994 Searay 290 DA |
                                    |
| 1999 270
Rinker This boat fell from its blocking onto
a cement drive and split the bottom, for approx. 10 feet. The
interior had to be removed, to facilitate the repair from the inside as
well as the outside. Many layers were ground away, and replaced.
Upon completion, the hull bottom was regelcoated, to match the original
surface. |
                                          |
| Vent Cover
Doral We are making a replacement side vent
cover that was lost and the part is no longer available from the dealer.
We are making a male mould from polyurethane foam, and then we will lay
it up and vacumm bag it. |
   |
|